Home page > Projects > Engineering work > Ligne 2 du Métro de Lille
Ligne 2 du Métro de Lille

Photo : Studio Joly
LOCATION Lille Métropole
ARCHITECT / CONTROL OF WORK Sofretu
YEAR OF DELIVERY 1994

Construction of 3.4 km of line 2 of the metro linking Lille (Gare Lille Europe) with Tourcoing (Hôpital Dron). Undertaken as a member of a consortium, this section has six underground stations that form part of the first automated metro system in the world.



  • logo nacarat
  • logo rabot dutilleul partenariats
  • Logo Rabot Dutilleul Construction
  • Logo Louis Dewaele
  • logo Simonis
  • Logo Rabot Dutilleul Bud
  • logo Betsinor
  • logo Sitex
  • logo groupe Dominique Housieaux